- Joined
- Aug 4, 2015
- Messages
- 411
- Reaction score
- 232
The kaplan and TPR books have some conflicting info - Kaplan says variable ratio is fastest and resistant to extinction, so the order is: variable ratio, fixed ratio, variable interval, fixed interval. BUT TPR says that fixed ratio is the best so the order is: fixed ratio, variable ratio, fixed interval, variable interval.
All I know for sure is that a ratio schedule > interval schedule. But which is better: fixed or variable schedule?
Thanks!
All I know for sure is that a ratio schedule > interval schedule. But which is better: fixed or variable schedule?
Thanks!