- Joined
- Aug 14, 2016
- Messages
- 3
- Reaction score
- 0
Hello,
I have noticed that I have an Accepted status an Completed status for two different observation entries. Both of them are considered "finished" and closed out, meaning I can no longer edit them. They were both entered in the same fashion and sent to the PT for verification. I didn't see anything on the PTCAS FAQ about this and was just curious if anyone else has experienced this.
I have noticed that I have an Accepted status an Completed status for two different observation entries. Both of them are considered "finished" and closed out, meaning I can no longer edit them. They were both entered in the same fashion and sent to the PT for verification. I didn't see anything on the PTCAS FAQ about this and was just curious if anyone else has experienced this.