Machines A and B always operate independently at their respective constant rates. When working alone, machine A can fill a production lot in 5 hours, and machine B can fill a separate production lot of the same size in x hours. When the two machines operate simultaneously to fill both production lots, it takes them 4 hours to complete the job. What is the value of x?
and
If it takes machine A 2 hours to do seven jobs, machine B 5 hours to do three jobs, and then ask how long it would take them to do 12 jobs working simultaneously?
thanks guys
and
If it takes machine A 2 hours to do seven jobs, machine B 5 hours to do three jobs, and then ask how long it would take them to do 12 jobs working simultaneously?