Beth Israel Boston (BIDMC)

This forum made possible through the generous support of SDN members, donors, and sponsors. Thank you.
The one about all their SAEM projects? Yeah, got that one too. I'm assuming everyone does.
Also, I believe they work 21 or 22 9hr shifts with 30-60 mins overage for cleanup at end of shift.
 
Top